From the Field Rates page, to set rates for one Location at a time:
- Hover over the Location you want to set the piece rate for.
- 💡 Tip: Any locations that do not have a piece rate assigned will display a note of 'No rate available' in red the Piece Rate column.
- Select the pencil icon.
- A flyout window will appear that says "New Piece Rates" or "Edit Piece Rates" depending on if a rate has previously been set.
- Decide if the unit type for the Location is Trees, Bins, or both.
- Under the applicable section(s), select either a Range or List.
- For a Range: Type in the minimum and maximum amounts for the range.
- For a List: Type in each value you want. Select the " + Add Another Rate" button below each value to add more.
- Select "Save."
Comments
0 comments
Please sign in to leave a comment.