Insights App: Performance Metrics
The list below summarizes the calculations for the performance metrics that can be used to sort the list of employees within the crew:
- Total pieces: total production units
- Duration: total hours
- Total labor cost: total labor cost
- Units / hour: pieces / total piece hours
- Average cost / unit: total labor cost / pieces
- Time / unit: total piece hours / pieces
- Average piece rate wage / hour: (piece rate x pieces) / total piece hours
- Start time: timestamp of the employee’s first checkin
- Minimum wage adjustment: total cost of adjustments
Definitions
- Pieces = production units
- Piece rate = compensation rate paid per production unit
- Total hours = work hours tied to all jobs
- Total piece hours = work hours tied to jobs that accept pieces.
Comments
0 comments
Please sign in to leave a comment.